International Works

LOCATION OF ASFALTIC CARPET IN PUQUIO AREA. NAZCA-CUZCO ROAD, P.K. 158.0 AL P.K. 179.8 (2.87 M)

The works consisted of the extension of an asphalt layer of 168,707.67 m2 with a thickness of 7.5 cm between the progressive 158 to 179.8 of sector 3 of the Interoceanic Southern Road Section I.

RECAPE OF THE LANDING FLOOR, REHABILITATION OF RODAGE STREET TWY TO AN LANDSCAPE IN THE INTERNATIONAL AIRPORT JORGE CHEVEZ (11,20 M)

The works consisted of the construction of a new rolling layer throughout the runway, as well as the necessary auxiliary works (crack sealing, horizontal signage, etc.). In addition, the section of the parallel runway that connects to headboard 15 (TWY A) was repaired and the work was carried out on stabilization, surface dust control and pigmentation in certain areas of the track strip and associated rollings.

More significant activities include milling of 180,491.3.

ALLATION OF A RUNWAY OF THE INTERNATIONAL AIRPORT RAFAEL NEZ DE CARTAGENA DE INDIAS (COLOMBIA) (3.83 M)

 

The works consisted of the construction of the new 4 cm thick run-rod on runway, including all affected services (electricity, lighting and horizontal/vertical signage). The most significant executed activities include milling of 28,300 m2xcm, the spread of 5,778 m3 of hot bituminous mixtures and the installation of 170 raised lights and 56 recessed lights.