Aeropuerto de Ibiza

At Ibiza Airport CONELSAN has carried out two major works:

EXECUTION OF OPERATIONAL SAFETY REQUIREMENTS (2.73 M )

 

In which the adaptations to RD 862/09 of the Air Navigation facilities, the AEMET facilities and the removal of obstacles in the field of flights were made. It should be noted that among the main ones were executed 54,199.22 m of smoothing wedges, the installation of 233 of beacon arches, and 2,419.00 m of tube bank of various types.

FLOORING REGENERATION FLIGHT FLOOR (5,00 M)

 

In which the asphalt pavement of the rolling layer was regenerated throughout the length of the runway (2,590.5 m) and the intermediate layer of disintegration zones of the runway was regenerated. The main actions performed were the firm milling of 1,446,517.00 m2xcm, the extension of 35,439.67 t, the execution of 6,830.00 m of slabs on pavement, as well as the actions in beacon and horizontal signage